Posted on 2021.10.31.
Vibrocomp ME has been contracted to carry out study for Upper Zakum field offshore facilities EIA
Posted on 2021.08.14.
Vibrocomp completed a comprehensive acoustic study on drilling rigs. PA/GA, system design, machinery noise aswell as HSE noise and vibration was investigated.
Posted on 2020.12.01.
Vibrocomp has been contracted to carry out noise designs for Aluminim Bahrain BSC
Posted on 2020.09.10.
Vibrocomp - Shift has been contracted, to carry out the interior and exterior acoustic designs for Qatar's new landmark, the Katara Tower. Picture above shows the acoustic model of the building.
Posted on 2020.08.06.
Vibrocomp has been contracted to carry out the vibration designs for the extensions of the Dubai Metro lines.